Tianhua Jiang

Orcid: 0000-0002-9260-4041

According to our database1, Tianhua Jiang authored at least 25 papers between 2018 and 2024.

Collaborative distances:
  • Dijkstra number2 of five.
  • Erdős number3 of four.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

On csauthors.net:

Bibliography

2024
A simple migrating birds optimization algorithm with two search modes to solve the no-wait job shop problem.
Expert Syst. Appl., March, 2024

2023
Application of hybrid artificial bee colony algorithm based on load balancing in aerospace composite material manufacturing.
Expert Syst. Appl., April, 2023

Hierarchical Multi-Objective Optimization for Dedicated Bus Punctuality and Supply-Demand Balance Control.
Sensors, 2023

A self-learning interior search algorithm based on reinforcement learning for energy-aware job shop scheduling problem with outsourcing option.
J. Intell. Fuzzy Syst., 2023

2022
Energy-conscious flexible job shop scheduling problem considering transportation time and deterioration effect simultaneously.
Sustain. Comput. Informatics Syst., 2022

A novel discrete elephant herding optimization for energy-saving flexible job shop scheduling problem with preventive maintenance.
J. Intell. Fuzzy Syst., 2022

A discrete animal migration algorithm for dual-resource constrained energy-saving flexible job shop scheduling problem.
J. Intell. Fuzzy Syst., 2022

A New Interior Search Algorithm for Energy-Saving Flexible Job Shop Scheduling with Overlapping Operations and Transportation Times.
Axioms, 2022

An Improved Elephant Herding Optimization for Energy-Saving Assembly Job Shop Scheduling Problem with Transportation Times.
Axioms, 2022

Migrating birds optimization with a diversified mechanism for blocking flow shops to minimize idle and blocking time.
Appl. Soft Comput., 2022

2021
Multi-objective discrete water wave optimization algorithm for solving the energy-saving job shop scheduling problem with variable processing speeds.
J. Intell. Fuzzy Syst., 2021

Modified JAYA algorithm for solving the flexible job shop scheduling problem considering worker flexibility and energy consumption.
Int. J. Wirel. Mob. Comput., 2021

Analysis of Beam-Column Designs by Varying Axial Load with Internal Forces and Bending Rigidity Using a New Soft Computing Technique.
Complex., 2021

2020
Improved African buffalo optimization algorithm for the green flexible job shop scheduling problem considering energy consumption.
J. Intell. Fuzzy Syst., 2020

A population-based iterated greedy algorithm for no-wait job shop scheduling with total flow time criterion.
Eng. Appl. Artif. Intell., 2020

Modified Migrating Birds Optimization for Energy-Aware Flexible Job Shop Scheduling Problem.
Algorithms, 2020

2019
Adaptive discrete cat swarm optimisation algorithm for the flexible job shop problem.
Int. J. Bio Inspired Comput., 2019

Total flow time minimization in no-wait job shop using a hybrid discrete group search optimizer.
Appl. Soft Comput., 2019

Energy-Conscious Scheduling Problem in a Flexible Job Shop Using a Discrete Water Wave Optimization Algorithm.
IEEE Access, 2019

Bi-Population Based Discrete Bat Algorithm for the Low-Carbon Job Shop Scheduling Problem.
IEEE Access, 2019

Green Job Shop Scheduling Problem With Discrete Whale Optimization Algorithm.
IEEE Access, 2019

2018
A Hybrid Grey Wolf Optimization for Job Shop Scheduling Problem.
Int. J. Comput. Intell. Appl., 2018

Multi-Objective Parallel Variable Neighborhood Search for Energy Consumption Scheduling in Blocking Flow Shops.
IEEE Access, 2018

Application of Grey Wolf Optimization for Solving Combinatorial Problems: Job Shop and Flexible Job Shop Scheduling Cases.
IEEE Access, 2018

Optimizing the Low-Carbon Flexible Job Shop Scheduling Problem Considering Energy Consumption.
IEEE Access, 2018


  Loading...