Vahid Kayvanfar

Orcid: 0000-0001-8268-9873

According to our database1, Vahid Kayvanfar authored at least 16 papers between 2013 and 2022.

Collaborative distances:
  • Dijkstra number2 of five.
  • Erdős number3 of four.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

Online presence:

On csauthors.net:

Bibliography

2022
An efficient population-based simulated annealing algorithm for 0-1 knapsack problem.
Eng. Comput., 2022

Cold Supply Chain Planning including Smart Contracts: An Intelligent Blockchain-based approach.
CoRR, 2022

Efficiency Evaluation of Banks with Many Branches using a Heuristic Framework and Dynamic Data Envelopment Optimization Approach: A Real Case Study.
CoRR, 2022

Home Health Care Planning with the Consideration of Flexible Starting/Ending Points and Service Features.
Axioms, 2022

2021
A new model for operating room scheduling with elective patient strategy.
INFOR Inf. Syst. Oper. Res., 2021

2018
Multi objective two-stage assembly flow shop with release time.
Comput. Ind. Eng., 2018

A multi-echelon multi-product stochastic model to supply chain of small-and-medium enterprises in industrial clusters.
Comput. Ind. Eng., 2018

An Intelligent Water Drops Algorithm to Supply-Demand Hub in Industrial Cluster Considering Transportation Mode.
Proceedings of the IEEE International Conference on Big Data (IEEE BigData 2018), 2018

2017
Analysis of a multi-echelon supply chain problem using revised multi-choice goal programming approach.
Kybernetes, 2017

Improved discrete cuckoo optimization algorithm for the three-stage assembly flowshop scheduling problem.
Comput. Ind. Eng., 2017

2016
Enhanced intelligent water drops and cuckoo search algorithms for solving the capacitated vehicle routing problem.
Inf. Sci., 2016

An Enhanced Intelligent Water Drops Algorithm for Scheduling of an Agile Manufacturing System.
Int. J. Inf. Technol. Decis. Mak., 2016

Analysis for supply hub in industrial cluster: Classic vs. new perspective.
Proceedings of the 2016 IEEE International Conference on Big Data (IEEE BigData 2016), 2016

2015
Grey Wolf Optimizer algorithm for the two-stage assembly flow shop scheduling problem with release time.
J. Comput. Sci., 2015

2014
Minimizing total tardiness and earliness on unrelated parallel machines with controllable processing times.
Comput. Oper. Res., 2014

2013
Single machine scheduling with controllable processing times to minimize total tardiness and earliness.
Comput. Ind. Eng., 2013


  Loading...