Vahid Mohagheghi
Orcid: 0000-0002-8404-2894
According to our database1,
Vahid Mohagheghi
authored at least 21 papers
between 2015 and 2024.
Collaborative distances:
Collaborative distances:
Timeline
Legend:
Book In proceedings Article PhD thesis Dataset OtherLinks
Online presence:
-
on orcid.org
On csauthors.net:
Bibliography
2024
A new bi-stage interactive possibilistic programming model for perishable logistics distribution systems under uncertainty.
Expert Syst. Appl., March, 2024
2022
Sustainable project portfolio selection and optimization with considerations of outsourcing decisions, financing options and staff assignment under interval type-2 fuzzy uncertainty.
Neural Comput. Appl., 2022
2021
An innovative interval type-2 fuzzy approach for multi-scenario multi-project cash flow evaluation considering TODIM and critical chain with an application to energy sector.
Neural Comput. Appl., 2021
A new multi-period optimization model for resilient-sustainable project portfolio evaluation under interval-valued Pythagorean fuzzy sets with a case study.
Int. J. Mach. Learn. Cybern., 2021
Introducing a multi-criteria evaluation method using Pythagorean fuzzy sets: A case study focusing on resilient construction project selection.
Kybernetes, 2021
A soft computing approach based on critical chain for project planning and control in real-world applications with interval data.
Appl. Soft Comput., 2021
2020
A new last aggregation method of multi-attributes group decision making based on concepts of TODIM, WASPAS and TOPSIS under interval-valued intuitionistic fuzzy uncertainty.
Knowl. Inf. Syst., 2020
J. Intell. Fuzzy Syst., 2020
Evaluating large, high-technology project portfolios using a novel interval-valued Pythagorean fuzzy set framework: An automated crane project case study.
Expert Syst. Appl., 2020
A new interval type-2 fuzzy approach for multi-scenario project cash flow assessment based on alternative queuing method and dependency structure matrix with a case study.
Eng. Appl. Artif. Intell., 2020
D-WASPAS: Addressing Social Cognition in Uncertain Decision-Making with an Application to a Sustainable Project Portfolio Problem.
Cogn. Comput., 2020
2019
An analysis approach to handle uncertain multi-criteria group decision problems in the framework of interval type-2 fuzzy sets theory.
Neural Comput. Appl., 2019
A new interval type-2 fuzzy approach for analyzing and monitoring the performance of megaprojects based on earned value analysis (with a case study).
Neural Comput. Appl., 2019
A new soft computing model based on linear assignment and linear programming technique for multidimensional analysis of preference with interval type-2 fuzzy sets.
Appl. Soft Comput., 2019
2018
Selecting project-critical path by a new interval type-2 fuzzy decision methodology based on MULTIMOORA, MOOSRA and TPOP methods.
Comput. Ind. Eng., 2018
2017
R&D project evaluation and project portfolio selection by a new interval type-2 fuzzy optimization approach.
Neural Comput. Appl., 2017
Analyzing project cash flow by a new interval type-2 fuzzy model with an application to construction industry.
Neural Comput. Appl., 2017
A mathematical modeling approach for high and new technology-project portfolio selection under uncertain environments.
J. Intell. Fuzzy Syst., 2017
A new approach of multi-criteria analysis for the evaluation and selection of sustainable transport investment projects under uncertainty: A case study.
Int. J. Comput. Intell. Syst., 2017
Enhancing decision-making flexibility by introducing a new last aggregation evaluating approach based on multi-criteria group decision making and Pythagorean fuzzy sets.
Appl. Soft Comput., 2017
2015
A new approach in considering vagueness and lack of knowledge for selecting sustainable portfolio of production projects.
Proceedings of the 2015 IEEE International Conference on Industrial Engineering and Engineering Management, 2015