Cemalettin Ozturk

According to our database1, Cemalettin Ozturk authored at least 16 papers between 2010 and 2020.

Collaborative distances:
  • Dijkstra number2 of four.
  • Erdős number3 of four.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Other 

Links

Homepage:

On csauthors.net:

Bibliography

2020
Assigning and Scheduling Service Visits in a Mixed Urban/Rural Setting.
Int. J. Artif. Intell. Tools, 2020

Empowering and engaging industrial workers with Operator 4.0 solutions.
Comput. Ind. Eng., 2020

Robust Resource Planning for Aircraft Ground Operations.
Proceedings of the Integration of Constraint Programming, Artificial Intelligence, and Operations Research, 2020

2019
Sttar: A Simheuristics-Enabled Scheme for Multi-Stakeholder Coordination Of Aircraft Turnaround Operations.
Proceedings of the 2019 Winter Simulation Conference, 2019

Simulation-Based Optimization Tool for Field Service Planning.
Proceedings of the 2019 Winter Simulation Conference, 2019

2018
Moreopt: A goal programming based movie recommender system.
J. Comput. Sci., 2018

User Evaluation of Industry 4.0 Concepts for Worker Engagement.
Proceedings of the Human Systems Engineering and Design, 2018

Object Detection at 200 Frames per Second.
Proceedings of the Computer Vision - ECCV 2018 Workshops, 2018

2015
An adaptive large neighbourhood search for designing transparent optical core network.
Proceedings of the 13th International Conference on Telecommunications, 2015

2014
Designing an Optical Island in the Core Network: From Routing to Spectrum Allocation.
Proceedings of the 26th IEEE International Conference on Tools with Artificial Intelligence, 2014

2013
Balancing and scheduling of flexible mixed model assembly lines.
Constraints An Int. J., 2013

Cyclic Scheduling of Flexible Mixed Model Assembly Lines.
Proceedings of the 7th IFAC Conference on Manufacturing Modelling, Management, and Control, 2013

2012
A MIP based heuristic for capacitated MRP systems.
Comput. Ind. Eng., 2012

2010
A note on "A mixed integer programming model for advanced planning and scheduling (APS)".
Eur. J. Oper. Res., 2010

Simultaneous Balancing and Scheduling of Flexible Mixed Model Assembly Lines with Sequence-Dependent Setup Times.
Electron. Notes Discret. Math., 2010

Capacitated lot sizing with linked lots for general product structures in job shops.
Comput. Ind. Eng., 2010


  Loading...