Gudrun P. Kiesmüller

Orcid: 0009-0003-4988-5428

According to our database1, Gudrun P. Kiesmüller authored at least 30 papers between 2003 and 2023.

Collaborative distances:
  • Dijkstra number2 of five.
  • Erdős number3 of four.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

Online presence:

On csauthors.net:

Bibliography

2023
The added value of advance demand information for the planning of a repair kit.
Central Eur. J. Oper. Res., March, 2023

Stochastic inventory routing with time-based shipment consolidation.
Eur. J. Oper. Res., 2023

The repair kit problem with imperfect advance demand information.
Eur. J. Oper. Res., 2023

2022
Inventory management with advance demand information and flexible shipment consolidation.
OR Spectr., 2022

Evaluation of Unreliable Flow Lines with Limited Buffer Capacities and Spare Part Provisioning.
Eur. J. Oper. Res., 2022

Multiperiod integrated spare parts and tour planning for on-site maintenance activities with stochastic repair requests.
Comput. Oper. Res., 2022

2020
Spare parts or buffer? How to design a transfer line with unreliable machines.
Eur. J. Oper. Res., 2020

Controlling distribution inventory systems with shipment consolidation and compound Poisson demand.
Eur. J. Oper. Res., 2020

2018
Publisher Correction: Approaches for periodic inventory control under random production yield and fixed setup cost.
OR Spectr., 2018

Approaches for periodic inventory control under random production yield and fixed setup cost.
OR Spectr., 2018

Disposal versus rework - Inventory control in a production system with random yield.
Eur. J. Oper. Res., 2018

Optimal and heuristic policies for assemble-to-order systems with different review periods.
Eur. J. Oper. Res., 2018

2016
The shape of the yield and its impact on inventory decisions.
4OR, 2016

2015
On the upgrading policy after the redesign of a component for reliability improvement.
Eur. J. Oper. Res., 2015

Exact and heuristic linear-inflation policies for an inventory model with random yield and arbitrary lead times.
Eur. J. Oper. Res., 2015

Evaluation of the expected makespan of a set of non-resumable jobs on parallel machines with stochastic failures.
Eur. J. Oper. Res., 2015

Cost minimising order schedules for a capacitated inventory system.
Ann. Oper. Res., 2015

2014
Effect of modeling fixed cost in a serial inventory system with periodic review.
OR Spectr., 2014

2013
Optimal control of an inventory-production system with state-dependent random yield.
Eur. J. Oper. Res., 2013

Analysis of a two-echelon inventory system with two supply modes.
Eur. J. Oper. Res., 2013

2011
Inventory models with lateral transshipments: A review.
Eur. J. Oper. Res., 2011

2010
Optimization of component reliability in the design phase of capital goods.
Eur. J. Oper. Res., 2010

Multi-item inventory control with full truckloads: A comparison of aggregate and individual order triggering.
Eur. J. Oper. Res., 2010

The benefit of VMI strategies in a stochastic multi-product serial two echelon system.
Comput. Oper. Res., 2010

2009
Monotonicity and supermodularity results for the Erlang loss system.
Oper. Res. Lett., 2009

2007
Developing a closed-form cost expression for an (R, s, nQ) policy where the demand process is compound generalized Erlang.
Oper. Res. Lett., 2007

2004
Evaluation of divergent N-echelon (s, nQ)-policies under compound renewal demand.
OR Spectr., 2004

2003
Simple expressions for finding recovery system inventory control parameter values.
J. Oper. Res. Soc., 2003

Computational issues in a stochastic finite horizon one product recovery inventory model.
Eur. J. Oper. Res., 2003

A new approach for controlling a hybrid stochastic manufacturing/remanufacturing system with inventories and different leadtimes.
Eur. J. Oper. Res., 2003


  Loading...