Leandro Magatão

Orcid: 0000-0002-6917-9753

According to our database1, Leandro Magatão authored at least 22 papers between 2001 and 2024.

Collaborative distances:
  • Dijkstra number2 of five.
  • Erdős number3 of four.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

Online presence:

On csauthors.net:

Bibliography

2024
An exact constraint programming based procedure for the multi-manned assembly line balancing problem.
Comput. Oper. Res., February, 2024

2023
Balancing-sequencing paced assembly lines: a multi-objective mixed-integer linear case study.
Int. J. Prod. Res., September, 2023

An exact method to incorporate ergonomic risks in Assembly Line Balancing Problems.
Comput. Ind. Eng., September, 2023

2022
Assembly line balancing with fractional task allocations.
Int. J. Prod. Res., 2022

2021
A solution framework for the long-term scheduling and inventory management of straight pipeline systems with multiple-sources.
Comput. Oper. Res., 2021

Assembly line balancing for two cycle times: Anticipating demand fluctuations.
Comput. Ind. Eng., 2021

2020
An iterative decomposition for asynchronous mixed-model assembly lines: combining balancing, sequencing, and buffer allocation.
Int. J. Prod. Res., 2020

A simheuristic approach for throughput maximization of asynchronous buffered stochastic mixed-model assembly lines.
Comput. Oper. Res., 2020

Scheduling of a single-source multiproduct pipeline system by a matheuristic approach: Combining simulated annealing and MILP.
Comput. Chem. Eng., 2020

Assigning and sequencing batches and blends of oil derivatives in a mesh-like pipeline network.
Comput. Chem. Eng., 2020

Mixed-model assembly lines balancing with given buffers and product sequence: model, formulation comparisons, and case study.
Ann. Oper. Res., 2020

2019
A Benders' decomposition algorithm with combinatorial cuts for the multi-manned assembly line balancing problem.
Eur. J. Oper. Res., 2019

2018
A matheuristic decomposition approach for the scheduling of a single-source and multiple destinations pipeline system.
Eur. J. Oper. Res., 2018

The Robotic Assembly Line Design (RALD) problem: Model and case studies with practical extensions.
Comput. Ind. Eng., 2018

2017
Traveling worker assembly line (re)balancing problem: Model, reduction techniques, and real case studies.
Eur. J. Oper. Res., 2017

Balancing a robotic spot welding manufacturing line: An industrial case study.
Eur. J. Oper. Res., 2017

Integer based formulation for the simple assembly line balancing problem with multiple identical tasks.
Comput. Ind. Eng., 2017

2011
A combined CLP-MILP approach for scheduling commodities in a pipeline.
J. Sched., 2011

2010
Mixed integer linear programming and constraint logic programming: towards a unified modeling framework.
PhD thesis, 2010

2007
Enhancing Supply Chain Decisions Using Constraint Programming: A Case Study.
Proceedings of the MICAI 2007: Advances in Artificial Intelligence, 2007

2004
A mixed integer programming approach for scheduling commodities in a pipeline.
Comput. Chem. Eng., 2004

2001
Sequencing inputs to a multi-product pipeline.
Proceedings of the 6th European Control Conference, 2001


  Loading...