Marek Vlk

Orcid: 0000-0003-4925-0812

According to our database1, Marek Vlk authored at least 12 papers between 2015 and 2022.

Collaborative distances:
  • Dijkstra number2 of four.
  • Erdős number3 of four.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

Online presence:

On csauthors.net:

Bibliography

2022
Large-scale periodic scheduling in time-sensitive networks.
Comput. Oper. Res., 2022

Constraint Programming and constructive heuristics for parallel machine scheduling with sequence-dependent setups and common servers.
Comput. Ind. Eng., 2022

2021
Constraint programming approaches to joint routing and scheduling in time-sensitive networks.
Comput. Ind. Eng., 2021

2020
Enhancing Schedulability and Throughput of Time-Triggered Traffic in IEEE 802.1Qbv Time-Sensitive Networks.
IEEE Trans. Commun., 2020

2019
Makespan Minimization with Sequence-dependent Non-overlapping Setups.
Proceedings of the 8th International Conference on Operations Research and Enterprise Systems, 2019

Online Multi-Agent Pathfinding.
Proceedings of the Thirty-Third AAAI Conference on Artificial Intelligence, 2019

2018
Energy-Aware Production Scheduling with Power-Saving Modes.
Proceedings of the Integration of Constraint Programming, Artificial Intelligence, and Operations Research, 2018

A Scheduling-Based Approach to Multi-Agent Path Finding with Weighted and Capacitated Arcs.
Proceedings of the 17th International Conference on Autonomous Agents and MultiAgent Systems, 2018

2017
Minimization of useless work in resource failure recovery of workflow schedules.
Proceedings of the 22nd IEEE International Conference on Emerging Technologies and Factory Automation, 2017

2016
Hierarchical Task Model for Resource Failure Recovery in Production Scheduling.
Proceedings of the Advances in Computational Intelligence, 2016

2015
Machine Breakdown Recovery in Production Scheduling with Simple Temporal Constraints.
Proceedings of the Agents and Artificial Intelligence - 7th International Conference, 2015

Reactive Recovery from Machine Breakdown in Production Scheduling with Temporal Distance and Resource Constraints.
Proceedings of the ICAART 2015, 2015


  Loading...