Mario Vanhoucke

Orcid: 0000-0001-6702-3563

According to our database1, Mario Vanhoucke authored at least 113 papers between 1998 and 2024.

Collaborative distances:
  • Dijkstra number2 of four.
  • Erdős number3 of four.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

Online presence:

On csauthors.net:

Bibliography

2024
An exact decomposition technique for the deadline-constrained discrete time/cost trade-off problem with discounted cash flows.
Comput. Oper. Res., March, 2024

Dynamic personnel rescheduling: insights and recovery strategies.
J. Sched., February, 2024

Correction to: on the summary measures for the resource-constrained project scheduling problem.
Ann. Oper. Res., January, 2024

2023
On the complexity of efficient multi-skilled team composition.
Comput. Oper. Res., September, 2023

A comparison of activity ranking methods for taking corrective actions during project control.
Comput. Ind. Eng., September, 2023

Automated design of priority rules for resource-constrained project scheduling problem using surrogate-assisted genetic programming.
Swarm Evol. Comput., August, 2023

Constructive heuristics for selecting and scheduling alternative subgraphs in resource-constrained projects.
Comput. Ind. Eng., August, 2023

Multi-project scheduling: A benchmark analysis of metaheuristic algorithms on various optimisation criteria and due dates.
Eur. J. Oper. Res., July, 2023

A classification and new benchmark instances for the multi-skilled resource-constrained project scheduling problem.
Eur. J. Oper. Res., May, 2023

New resource-constrained project scheduling instances for testing (meta-)heuristic scheduling algorithms.
Comput. Oper. Res., May, 2023

A prediction model for ranking branch-and-bound procedures for the resource-constrained project scheduling problem.
Eur. J. Oper. Res., 2023

2022
A Theoretical Framework for Instance Complexity of the Resource-Constrained Project Scheduling Problem.
Math. Oper. Res., November, 2022

Multimode time-cost-robustness trade-off project scheduling problem under uncertainty.
J. Comb. Optim., 2022

Various extensions in resource-constrained project scheduling with alternative subgraphs.
Int. J. Prod. Res., 2022

An efficient genetic programming approach to design priority rules for resource-constrained project scheduling problem.
Expert Syst. Appl., 2022

Using Earned Value Management and Schedule Risk Analysis with resource constraints for project control.
Eur. J. Oper. Res., 2022

The bilevel optimisation of a multi-agent project scheduling and staffing problem.
Eur. J. Oper. Res., 2022

New summary measures and datasets for the multi-project scheduling problem.
Eur. J. Oper. Res., 2022

A reduction tree approach for the Discrete Time/Cost Trade-Off Problem.
Comput. Oper. Res., 2022

Mathematical formulations for project scheduling problems with categorical and hierarchical skills.
Comput. Ind. Eng., 2022

Manufacturing project scheduling considering human factors to minimize total cost and carbon footprints.
Appl. Soft Comput., 2022

2021
Automatic detection of the best performing priority rule for the resource-constrained project scheduling problem.
Expert Syst. Appl., 2021

Using Schedule Risk Analysis with resource constraints for project control.
Eur. J. Oper. Res., 2021

A new algorithm for resource-constrained project scheduling with breadth and depth of skills.
Eur. J. Oper. Res., 2021

Practical application of reference class forecasting for cost and time estimations: Identifying the properties of similarity.
Eur. J. Oper. Res., 2021

An analysis of network and resource indicators for resource-constrained project scheduling problem instances.
Comput. Oper. Res., 2021

A column generation-based diving heuristic to solve the multi-project personnel staffing problem with calendar constraints and resource sharing.
Comput. Oper. Res., 2021

Finite inventory budgets in production capacity and safety stock placement under the guaranteed service approach.
Comput. Oper. Res., 2021

An analytical model for budget allocation in risk prevention and risk protection.
Comput. Ind. Eng., 2021

2020
Resource-constrained multi-project scheduling: benchmark datasets and decoupled scheduling.
J. Sched., 2020

The impact of a limited budget on the corrective action taking process.
Eur. J. Oper. Res., 2020

A decomposed branch-and-price procedure for integrating demand planning in personnel staffing problems.
Eur. J. Oper. Res., 2020

Project schedule performance under general mode implementation disruptions.
Eur. J. Oper. Res., 2020

Optimizing production capacity and safety stocks in general acyclic supply chains.
Comput. Oper. Res., 2020

Going to the core of hard resource-constrained project scheduling instances.
Comput. Oper. Res., 2020

Analysing the impact of alternative network structures on resource-constrained schedules: Artificial and empirical experiments.
Comput. Ind. Eng., 2020

Multi-mode schedule optimisation for incentivised projects.
Comput. Ind. Eng., 2020

Mode generation rules to define activity flexibility for the integrated project staffing problem with discrete time/resource trade-offs.
Ann. Oper. Res., 2020

A Simulation Study on the Impact of Activity Crashing on the Project Duration and Cost under Different Budget Release Scenarios.
Proceedings of the 2020 Federated Conference on Computer Science and Information Systems, 2020

2019
Strategies for project scheduling with alternative subgraphs under uncertainty: similar and dissimilar sets of schedules.
Eur. J. Oper. Res., 2019

A tabu search procedure for the resource-constrained project scheduling problem with alternative subgraphs.
Eur. J. Oper. Res., 2019

The impact of applying effort to reduce activity variability on the project time and cost performance.
Eur. J. Oper. Res., 2019

A Statistical Method for Estimating Activity Uncertainty Parameters to Improve Project Forecasting.
Entropy, 2019

Resource-constrained project scheduling with activity splitting and setup times.
Comput. Oper. Res., 2019

The impact of solution representations on heuristic net present value optimization in discrete time/cost trade-off project scheduling with multiple cash flow and payment models.
Comput. Oper. Res., 2019

A heuristic procedure to solve the project staffing problem with discrete time/resource trade-offs and personnel scheduling constraints.
Comput. Oper. Res., 2019

Computing project makespan distributions: Markovian PERT networks revisited.
Comput. Oper. Res., 2019

An agency perspective for multi-mode project scheduling with time/cost trade-offs.
Comput. Oper. Res., 2019

Fitting activity distributions using human partitioning and statistical calibration.
Comput. Ind. Eng., 2019

Tolerance limits for project control: An overview of different approaches.
Comput. Ind. Eng., 2019

2018
A perturbation matheuristic for the integrated personnel shift and task re-scheduling problem.
Eur. J. Oper. Res., 2018

Maximising the weighted number of activity execution modes in project planning.
Eur. J. Oper. Res., 2018

An exact composite lower bound strategy for the resource-constrained project scheduling problem.
Comput. Oper. Res., 2018

A tool to test and validate algorithms for the resource-constrained project scheduling problem.
Comput. Ind. Eng., 2018

2017
A metaheuristic solution approach for the time-constrained project scheduling problem.
OR Spectr., 2017

A Nearest Neighbour extension to project duration forecasting with Artificial Intelligence.
Eur. J. Oper. Res., 2017

A buffer control method for top-down project control.
Eur. J. Oper. Res., 2017

Capital- and resource-constrained project scheduling with net present value optimization.
Eur. J. Oper. Res., 2017

A parallel multi-objective scatter search for optimising incentive contract design in projects.
Eur. J. Oper. Res., 2017

On the performance of priority rules for the stochastic resource constrained multi-project scheduling problem.
Comput. Ind. Eng., 2017

The integration of constrained resources into top-down project control.
Comput. Ind. Eng., 2017

On the resource renting problem with overtime.
Comput. Ind. Eng., 2017

A resource type analysis of the integrated project scheduling and personnel staffing problem.
Ann. Oper. Res., 2017

2016
An exact algorithm for an integrated project staffing problem with a homogeneous workforce.
J. Sched., 2016

A comparative study of Artificial Intelligence methods for project duration forecasting.
Expert Syst. Appl., 2016

An approach using SAT solvers for the RCPSP with logical constraints.
Eur. J. Oper. Res., 2016

Payment models and net present value optimization for resource-constrained project scheduling.
Comput. Ind. Eng., 2016

2015
Operating theatre modelling: integrating social measures.
J. Simulation, 2015

A comparison of the performance of various project control methods using earned value management systems.
Expert Syst. Appl., 2015

A multivariate approach for top-down project control using earned value management.
Decis. Support Syst., 2015

Hybrid tabu search and a truncated branch-and-bound for the unrelated parallel machine scheduling problem.
Comput. Oper. Res., 2015

Influence of learning in resource-constrained project scheduling.
Comput. Ind. Eng., 2015

Blended Learning in Project Management - Experiences on Business Games and Case Studies.
Proceedings of the CSEDU 2015, 2015

2014
Analysis of the Integration of the Physician Rostering Problem and the Surgery Scheduling Problem.
J. Medical Syst., 2014

An experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instances.
Eur. J. Oper. Res., 2014

A hybrid Electromagnetism-like Mechanism/tabu search procedure for the single machine scheduling problem with a maximum lateness objective.
Comput. Ind. Eng., 2014

2013
An Artificial Immune System Based Approach for Solving the Nurse Re-rostering Problem.
Proceedings of the Evolutionary Computation in Combinatorial Optimization, 2013

2012
A hybrid genetic algorithm for the single machine maximum lateness problem with release times and family setups.
Comput. Oper. Res., 2012

2011
Using resource scarceness characteristics to solve the multi-mode resource-constrained project scheduling problem.
J. Heuristics, 2011

A hybrid single and dual population search procedure for the job shop scheduling problem.
Eur. J. Oper. Res., 2011

Multi-mode resource-constrained project scheduling using RCPSP and SAT solvers.
Eur. J. Oper. Res., 2011

An evolutionary approach for the nurse rerostering problem.
Comput. Oper. Res., 2011

Applying a hybrid job shop procedure to a Belgian manufacturing company producing industrial wheels and castors in rubber.
Comput. Ind. Eng., 2011

A Hybrid Dual-Population Genetic Algorithm for the Single Machine Maximum Lateness Problem.
Proceedings of the Evolutionary Computation in Combinatorial Optimization, 2011

2010
Branching strategies in a branch-and-price approach for a multiple objective nurse scheduling problem.
J. Sched., 2010

Introducing Optimization Techniques to Students: An Exam Case Distribution Model.
INFORMS Trans. Educ., 2010

A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem.
Eur. J. Oper. Res., 2010

A hybrid scatter search heuristic for personalized crew rostering in the airline industry.
Eur. J. Oper. Res., 2010

2009
The impact of incorporating nurse-specific characteristics in a cyclical scheduling approach.
J. Oper. Res. Soc., 2009

On the characterization and generation of nurse scheduling problem instances.
Eur. J. Oper. Res., 2009

A Genetic Algorithm for Net Present Value Maximization for Resource Constrained Projects.
Proceedings of the Evolutionary Computation in Combinatorial Optimization, 2009

An Artificial Immune System for the Multi-Mode Resource-Constrained Project Scheduling Problem.
Proceedings of the Evolutionary Computation in Combinatorial Optimization, 2009

2008
Diversity in Resource Consumption Patterns and Robustness of Costing Systems to Errors.
Manag. Sci., 2008

An evaluation of the adequacy of project network generators with systematically sampled networks.
Eur. J. Oper. Res., 2008

The impact of various activity assumptions on the lead time and resource utilization of resource-constrained projects.
Comput. Ind. Eng., 2008

Setup times and fast tracking in resource-constrained project scheduling.
Comput. Ind. Eng., 2008

Comparison and hybridization of crossover operators for the nurse scheduling problem.
Ann. Oper. Res., 2008

2007
A simulation and evaluation of earned value metrics to forecast the project duration.
J. Oper. Res. Soc., 2007

A Decomposition-Based Genetic Algorithm for the Resource-Constrained Project-Scheduling Problem.
Oper. Res., 2007

An electromagnetic meta-heuristic for the nurse scheduling problem.
J. Heuristics, 2007

2006
A hybrid scatter search/electromagnetism meta-heuristic for project scheduling.
Eur. J. Oper. Res., 2006

Scheduling an R&D Project with Quality-Dependent Time Slots.
Proceedings of the Computational Science and Its Applications, 2006

An Efficient Hybrid Search Algorithm for Various Optimization Problems.
Proceedings of the Evolutionary Computation in Combinatorial Optimization, 2006

New Computational Results for the Nurse Scheduling Problem: A Scatter Search Algorithm.
Proceedings of the Evolutionary Computation in Combinatorial Optimization, 2006

2005
New computational results for the discrete time/cost trade-off problem with time-switch constraints.
Eur. J. Oper. Res., 2005

A Bi-population Based Genetic Algorithm for the Resource-Constrained Project Scheduling Problem.
Proceedings of the Computational Science and Its Applications, 2005

The Electromagnetism Meta-heuristic Applied to the Resource-Constrained Project Scheduling Problem.
Proceedings of the Artificial Evolution, 2005

2003
RanGen: A Random Network Generator for Activity-on-the-Node Networks.
J. Sched., 2003

Progress payments in project scheduling problems.
Eur. J. Oper. Res., 2003

2002
Discrete time/cost trade-offs in project scheduling with time-switch constraints.
J. Oper. Res. Soc., 2002

2001
On Maximizing the Net Present Value of a Project Under Renewable Resource Constraints.
Manag. Sci., 2001

An Exact Procedure for the Resource-Constrained Weighted Earliness-Tardiness Project Scheduling Problem.
Ann. Oper. Res., 2001

1998
New computational results on the discrete time/cost trade-off problem in project networks.
J. Oper. Res. Soc., 1998


  Loading...