Erik Demeulemeester

According to our database1, Erik Demeulemeester authored at least 65 papers between 1993 and 2020.

Collaborative distances:
  • Dijkstra number2 of five.
  • Erdős number3 of four.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Other 

Links

Online presence:

On csauthors.net:

Bibliography

2020
Expectation and SAA Models and Algorithms for Scheduling of Multiple Earth Observation Satellites Under the Impact of Clouds.
IEEE Syst. J., 2020

The distributionally robust machine scheduling problem with job selection and sequence-dependent setup times.
Comput. Oper. Res., 2020

2019
A Genetic Algorithm for the Proactive Resource-Constrained Project Scheduling Problem With Activity Splitting.
IEEE Trans. Engineering Management, 2019

Exact and Heuristic Scheduling Algorithms for Multiple Earth Observation Satellites Under Uncertainties of Clouds.
IEEE Syst. J., 2019

The proactive and reactive resource-constrained project scheduling problem.
J. Sched., 2019

Robust resource-constrained max-NPV project scheduling with stochastic activity duration.
OR Spectr., 2019

Literature review on multi-appointment scheduling problems in hospitals.
Eur. J. Oper. Res., 2019

A computational experiment to explore better robustness measures for project scheduling under two types of uncertain environments.
Comput. Ind. Eng., 2019

Important classes of reactions for the proactive and reactive resource-constrained project scheduling problem.
Ann. Oper. Res., 2019

2018
Efficient priority rules for the stochastic resource-constrained project scheduling problem.
Eur. J. Oper. Res., 2018

A model enhancement approach for optimizing the integrated shift scheduling and vehicle routing problem in waste collection.
Eur. J. Oper. Res., 2018

A three-stage mixed integer programming approach for optimizing the skill mix and training schedules for aircraft maintenance.
Eur. J. Oper. Res., 2018

2016
Scheduling operating rooms: achievements, challenges and pitfalls.
J. Sched., 2016

A genetic algorithm for the robust resource leveling problem.
J. Sched., 2016

A purely proactive scheduling procedure for the resource-constrained project scheduling problem with stochastic activity durations.
J. Sched., 2016

Exact algorithms for single-machine scheduling with time windows and precedence constraints.
J. Sched., 2016

Editorial "Project Management and Scheduling".
OR Spectr., 2016

A sequential procurement model for a PPP project pipeline.
OR Spectr., 2016

Incorporation of activity sensitivity measures into buffer management to manage project schedule risk.
Eur. J. Oper. Res., 2016

A pure proactive scheduling algorithm for multiple earth observation satellites under uncertainties of clouds.
Comput. Oper. Res., 2016

2015
Fault-Tolerant Scheduling for Real-Time Tasks on Multiple Earth-Observation Satellites.
IEEE Trans. Parallel Distributed Syst., 2015

A model enhancement heuristic for building robust aircraft maintenance personnel rosters with stochastic constraints.
Eur. J. Oper. Res., 2015

Workforce planning incorporating skills: State of the art.
Eur. J. Oper. Res., 2015

Determining the timing of project control points using a facility location model and simulation.
Comput. Oper. Res., 2015

2014
Railway scheduling reduces the expected project makespan over roadrunner scheduling in a multi-mode project scheduling environment.
Ann. Oper. Res., 2014

A new approach for quantitative risk analysis.
Ann. Oper. Res., 2014

2013
A three-stage approach for aircraft line maintenance personnel rostering using MIP, discrete event simulation and DEA.
Expert Syst. Appl., 2013

Personnel scheduling: A literature review.
Eur. J. Oper. Res., 2013

A multilevel integrative approach to hospital case mix and capacity planning.
Comput. Oper. Res., 2013

Integrated staffing and scheduling for an aircraft line maintenance problem.
Comput. Oper. Res., 2013

2012
Improving Workforce Scheduling of Aircraft Line Maintenance at Sabena Technics.
Interfaces, 2012

2011
A Decision Support System for Surgery Sequencing at Uz Leuven's Day-Care Department.
Int. J. Inf. Technol. Decis. Mak., 2011

Proactive policies for the stochastic resource-constrained project scheduling problem.
Eur. J. Oper. Res., 2011

Reactive scheduling in the multi-mode RCPSP.
Comput. Oper. Res., 2011

RESCON: Educational project scheduling software.
Comput. Appl. Eng. Educ., 2011

Time slack-based techniques for robust project scheduling subject to resource uncertainty.
Ann. Oper. Res., 2011

Project risk management: A new approach.
Proceedings of the 2011 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM), 2011

2010
Robust Project Scheduling.
Found. Trends Technol. Inf. Oper. Manag., 2010

Operating room planning and scheduling: A literature review.
Eur. J. Oper. Res., 2010

2009
A decision support system for cyclic master surgery scheduling with multiple objectives.
J. Sched., 2009

Sequencing surgical cases in a day-care environment: An exact branch-and-price approach.
Comput. Oper. Res., 2009

2008
Proactive and reactive strategies for resource-constrained project scheduling with uncertain resource availabilities.
J. Sched., 2008

Capacity of Clinical Pathways - A Strategic Multi-level Evaluation Tool.
J. Medical Syst., 2008

Proactive heuristic procedures for robust project scheduling: An experimental analysis.
Eur. J. Oper. Res., 2008

A branch-and-price approach for integrating nurse and surgery scheduling.
Eur. J. Oper. Res., 2008

2007
A classification of predictive-reactive project scheduling procedures.
J. Sched., 2007

Introduction to the special issue: project scheduling under uncertainty.
J. Sched., 2007

Building cyclic master surgery schedules with leveled resulting bed occupancy.
Eur. J. Oper. Res., 2007

Robust Resource Allocation Decisions in Resource-Constrained Projects.
Decis. Sci., 2007

Heuristic procedures for reactive project scheduling.
Comput. Ind. Eng., 2007

On the trade-off between staff-decomposed and activity-decomposed column generation for a staff scheduling problem.
Ann. Oper. Res., 2007

2006
Visualizing the Demand for Various Resources as a Function of the Master Surgery Schedule: A Case Study.
J. Medical Syst., 2006

Scheduling trainees at a hospital department using a branch-and-price approach.
Eur. J. Oper. Res., 2006

2004
Book Review/Project Scheduling with Time Windows and Scarce Resources by Klaus Neumann, Christoph Schwindt and Jürgen Zimmermann.
J. Sched., 2004

2003
RanGen: A Random Network Generator for Activity-on-the-Node Networks.
J. Sched., 2003

Progress payments in project scheduling problems.
Eur. J. Oper. Res., 2003

2002
Discrete time/cost trade-offs in project scheduling with time-switch constraints.
J. Oper. Res. Soc., 2002

2001
On Maximizing the Net Present Value of a Project Under Renewable Resource Constraints.
Manag. Sci., 2001

A note on the paper "Resource-constrained project scheduling: Notation, classification, models and methods" by Brucker et al.
Eur. J. Oper. Res., 2001

An Exact Procedure for the Resource-Constrained Weighted Earliness-Tardiness Project Scheduling Problem.
Ann. Oper. Res., 2001

1998
New computational results on the discrete time/cost trade-off problem in project networks.
J. Oper. Res. Soc., 1998

Resource-constrained project scheduling: A survey of recent developments.
Comput. Oper. Res., 1998

1997
A Branch-and-Bound Procedure for the Generalized Resource-Constrained Project Scheduling Problem.
Oper. Res., 1997

Project network models with discounted cash flows a guided tour through recent developments.
Eur. J. Oper. Res., 1997

1993
A Random Activity Network Generator.
Oper. Res., 1993