Ningjian Huang

Orcid: 0000-0002-7021-8705

According to our database1, Ningjian Huang authored at least 22 papers between 1992 and 2022.

Collaborative distances:
  • Dijkstra number2 of five.
  • Erdős number3 of four.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

On csauthors.net:

Bibliography

2022
Analysis of assembly-time performance (ATP) in manufacturing operations with collaborative robots: a systems approach.
Int. J. Prod. Res., 2022

2021
From Manual Operation to Collaborative Robot Assembly: An Integrated Model of Productivity and Ergonomic Performance.
IEEE Robotics Autom. Lett., 2021

2017
Optimal Planning of Plant Flexibility: Problem Formulation and Performance Analysis.
IEEE Trans Autom. Sci. Eng., 2017

Flexible Serial Lines With Setups: Analysis, Improvement, and Application.
IEEE Robotics Autom. Lett., 2017

2016
Efficient Algorithms for Analysis and Improvement of Flexible Manufacturing Systems.
IEEE Trans Autom. Sci. Eng., 2016

Uncertainty-aware RFID network planning for target detection and target location.
J. Netw. Comput. Appl., 2016

2015
Plant flexibility planning: Problem formulation and performance estimation.
Proceedings of the IEEE International Conference on Automation Science and Engineering, 2015

2014
A Quality Flow Model in Battery Manufacturing Systems for Electric Vehicles.
IEEE Trans Autom. Sci. Eng., 2014

Optimization of a Factory Line Using Multi-Objective Evolutionary Algorithms.
Proceedings of the Dynamics in Logistics, 2014

Performance evaluation of multi-product manufacturing systems with asynchronous exponential machines.
Proceedings of the 2014 IEEE International Conference on Automation Science and Engineering, 2014

2013
A Simulation-Based Tool for Energy Efficient Building Design for a Class of Manufacturing Plants.
IEEE Trans Autom. Sci. Eng., 2013

2011
Simulation based evaluation and optimization for energy consumption of a typical welding shop.
Proceedings of the IEEE Conference on Automation Science and Engineering, 2011

2010
Efficient Simulation Method for General Assembly Systems With Material Handling Based on Aggregated Event-Scheduling.
IEEE Trans Autom. Sci. Eng., 2010

Formulation and a Simulation-Based Algorithm for Line-Side Buffer Assignment Problem in Systems of General Assembly Line With Material Handling.
IEEE Trans Autom. Sci. Eng., 2010

Quality Analysis in Flexible Manufacturing Systems With Batch Productions: Performance Evaluation and Nonmonotonic Properties.
IEEE Trans Autom. Sci. Eng., 2010

2009
Monotonic and non-monotonic properties of product quality in flexible manufacturing systems with batch operations.
Proceedings of the IEEE Conference on Automation Science and Engineering, 2009

2008
Efficient simulation for serial production lines based on aggregated event-scheduling.
Proceedings of the 2008 IEEE International Conference on Automation Science and Engineering, 2008

Quality analysis in flexible manufacturing systems with batch productions.
Proceedings of the 2008 IEEE International Conference on Automation Science and Engineering, 2008

2007
Quality Evaluation in Flexible Machining Systems: A Flexible Fixture Case Study.
Proceedings of the 2007 IEEE International Conference on Robotics and Automation, 2007

2004
Modeling and Analysis of a Multiple Product Manufacturing System with Split and Merge.
Proceedings of the 2004 IEEE International Conference on Robotics and Automation, 2004

1993
Real-Time Simulation and Animation of Suspension Control System Using TI TMS320C30 Digital Signal Processor.
Simul., 1993

1992
Real-time simulation and animation for dynamic control systems.
Simul., 1992


  Loading...