Guoxian Xiao

According to our database1, Guoxian Xiao authored at least 34 papers between 2007 and 2022.

Collaborative distances:
  • Dijkstra number2 of five.
  • Erdős number3 of four.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

On csauthors.net:

Bibliography

2022
Integrated Process-System Modeling and Performance Analysis for Serial Production Lines.
IEEE Robotics Autom. Lett., 2022

Paint shop vehicle sequencing based on quantum computing considering color changeover and painting quality.
CoRR, 2022

2019
Improved Production Performance Through Manufacturing System Learning.
Proceedings of the 15th IEEE International Conference on Automation Science and Engineering, 2019

2018
Modeling and Performance Diagnostics of Composite Work Cells With Gantries.
IEEE Trans Autom. Sci. Eng., 2018

Analysis and Evaluation of Control Action End-State Impact on Manufacturing System Future Production.
IEEE Access, 2018

Analysis of End-of-State Impact on Manufacturing System Production Performance.
Proceedings of the 14th IEEE International Conference on Automation Science and Engineering, 2018

Real-time Control of Maintenance on Deteriorating Manufacturing System.
Proceedings of the 14th IEEE International Conference on Automation Science and Engineering, 2018

2017
Dynamic production system diagnosis and prognosis using model-based data-driven method.
Expert Syst. Appl., 2017

2016
Implementing a Real-Time, Energy-Efficient Control Methodology to Maximize Manufacturing Profits.
IEEE Trans. Syst. Man Cybern. Syst., 2016

Performance Analysis of Assembly Systems With Bernoulli Machines and Finite Buffers During Transients.
IEEE Trans Autom. Sci. Eng., 2016

Finite Production Run-Based Serial Lines With Bernoulli Machines: Performance Analysis, Bottleneck, and Case Study.
IEEE Trans Autom. Sci. Eng., 2016

Sustainable Manufacturing Performance Indicators for a Serial Production Line.
IEEE Trans Autom. Sci. Eng., 2016

Transient Performance Analysis of Serial Production Lines With Geometric Machines.
IEEE Trans. Autom. Control., 2016

Performance evaluation in finite production run-based serial lines with geometric machines.
Proceedings of the IEEE International Conference on Automation Science and Engineering, 2016

2015
Market Demand Oriented Data-Driven Modeling for Dynamic Manufacturing System Control.
IEEE Trans. Syst. Man Cybern. Syst., 2015

Data-Driven Analysis of Downtime Impacts in Parallel Production Systems.
IEEE Trans Autom. Sci. Eng., 2015

Performance analysis of Bernoulli serial production lines with switch-on/off machine control.
Proceedings of the IEEE International Conference on Automation Science and Engineering, 2015

2014
A Quality Flow Model in Battery Manufacturing Systems for Electric Vehicles.
IEEE Trans Autom. Sci. Eng., 2014

Energy Efficiency Management of an Integrated Serial Production Line and HVAC System.
IEEE Trans Autom. Sci. Eng., 2014

Threshold-type admission policy for remanufacturing systems.
Proceedings of the 2014 IEEE International Conference on Automation Science and Engineering, 2014

Analysis and improvement of batch-based production lines with Bernoulli machines.
Proceedings of the 2014 IEEE International Conference on Automation Science and Engineering, 2014

Utilizing energy opportunity windows and energy profit bottlenecks to reduce energy consumption per part for a serial production line.
Proceedings of the 2014 IEEE International Conference on Automation Science and Engineering, 2014

2013
Virtual Battery: A Battery Simulation Framework for Electric Vehicles.
IEEE Trans Autom. Sci. Eng., 2013

Assembly Strategies for Remanufacturing Systems With Variable Quality Returns.
IEEE Trans Autom. Sci. Eng., 2013

Energy Saving Opportunity Analysis of Automotive Serial Production Systems (March 2012).
IEEE Trans Autom. Sci. Eng., 2013

Modeling Quality Propagation in Automotive Paint Shops: An Application Study.
Proceedings of the 7th IFAC Conference on Manufacturing Modelling, Management, and Control, 2013

Energy Savings Opportunities and Energy Efficiency Performance Indicators for a Serial Production Line.
Proceedings of the Advances in Production Management Systems. Sustainable Production and Service Supply Chains, 2013

Integrated model of productivity and quality in serial production lines with repairs: Performance evaluation and bottleneck identification.
Proceedings of the 2013 IEEE International Conference on Automation Science and Engineering, 2013

Analysis of production completion time in Bernoulli serial lines with finite buffers.
Proceedings of the 2013 IEEE International Conference on Automation Science and Engineering, 2013

2011
Data driven production modeling and simulation of complex automobile general assembly plant.
Comput. Ind., 2011

Virtual battery: A simulation framework for batteries in electric vehicles.
Proceedings of the IEEE Conference on Automation Science and Engineering, 2011

2010
Formulation and a Simulation-Based Algorithm for Line-Side Buffer Assignment Problem in Systems of General Assembly Line With Material Handling.
IEEE Trans Autom. Sci. Eng., 2010

Hybrid/electric vehicle battery manufacturing: The state-of-the-art.
Proceedings of the IEEE Conference on Automation Science and Engineering, 2010

2007
Maintenance staffing management.
J. Intell. Manuf., 2007


  Loading...