Olga Battaïa

Orcid: 0000-0002-5367-7846

According to our database1, Olga Battaïa authored at least 54 papers between 2012 and 2024.

Collaborative distances:

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

Online presence:

On csauthors.net:

Bibliography

2024
Integrating physiological and mental aspects in employee scheduling: an overview for practitioners in production management.
Int. J. Prod. Res., March, 2024

An exact method for machining lines design with equipment selection and line balancing.
Int. J. Prod. Res., January, 2024

2023
Assembly line balancing and worker assignment considering workers' expertise and perceived physical effort.
Int. J. Prod. Res., October, 2023

Logistics distribution optimization: Fuzzy clustering analysis of e-commerce customers' demands.
Comput. Ind., October, 2023

Precedence constrained generalized traveling salesman problem: Polyhedral study, formulations, and branch-and-cut algorithm.
Eur. J. Oper. Res., September, 2023

MILP model for fleet and charging infrastructure decisions for fast-charging city electric bus services.
Comput. Ind. Eng., August, 2023

Managing disruptions in aircraft assembly lines with staircase criteria.
Int. J. Prod. Res., January, 2023

A multi-vendor multi-buyer integrated production-inventory model with synchronised unequal-sized batch delivery.
Int. J. Prod. Res., January, 2023

2022
Erratum to "Benders decomposition for a period-aggregated resource leveling problem with variable job duration" [Comput. Oper. Res. 132 (2021) 105258].
Comput. Oper. Res., 2022

2021
A novel solution approach with ML-based pseudo-cuts for the Flight and Maintenance Planning problem.
OR Spectr., 2021

A new algorithm for solving uncapacitated transportation problem with interval-defined demands and suppliers capacities.
J. Intell. Fuzzy Syst., 2021

Design of reverse supply chains under uncertainty: the lexicographic R* criterion for exploring opportunities.
Int. J. Prod. Res., 2021

Exploring the opportunities in establishing a closed-loop supply chain under uncertainty.
Int. J. Prod. Res., 2021

Consideration of workers' differences in production systems modelling and design: State of the art and directions for future research.
Int. J. Prod. Res., 2021

Benders decomposition for a period-aggregated resource leveling problem with variable job duration.
Comput. Oper. Res., 2021

MIP-Based Heuristics for a Robust Transfer Lines Balancing Problem.
Proceedings of the Optimization and Applications - 12th International Conference, 2021

Assembly Line Balancing with Inexperienced and Trainer Workers.
Proceedings of the Advances in Production Management Systems. Artificial Intelligence for Sustainable and Resilient Production Systems, 2021

Mathematical Model for Processing Multiple Parts on Multi-positional Reconfigurable Machines with Turrets.
Proceedings of the Advances in Production Management Systems. Artificial Intelligence for Sustainable and Resilient Production Systems, 2021

2020
Special issue on sustainability with innovation for manufacturing and supply chain management.
Int. J. Prod. Res., 2020

Optimal cost design of flow lines with reconfigurable machines for batch production.
Int. J. Prod. Res., 2020

A distributive approach for position control of clamps in a reconfigurable assembly fixture.
Int. J. Autom. Control., 2020

Long term planning of military aircraft flight and maintenance operations.
CoRR, 2020

Modularization of smart product service: A framework integrating smart product service blueprint and weighted complex network.
Comput. Ind., 2020

Globalisation vs. Slowbalisation: a literature review of analytical models for sourcing decisions in supply chain management.
Annu. Rev. Control., 2020

A Generalized MILP Formulation for the Period-Aggregated Resource Leveling Problem with Variable Job Duration.
Algorithms, 2020

Decision Under Ignorance: A Comparison of Existing Criteria.
Proceedings of the Information Processing and Management of Uncertainty in Knowledge-Based Systems, 2020

2019
Sample average approximation for multi-vehicle collection-disassembly problem under uncertainty.
Int. J. Prod. Res., 2019

An efficient pseudo-polynomial algorithm for finding a lower bound on the makespan for the Resource Constrained Project Scheduling Problem.
Eur. J. Oper. Res., 2019

2018
An optimisation support for the design of hybrid production lines including assembly and disassembly tasks.
Int. J. Prod. Res., 2018

Profit-oriented partial disassembly line design: dealing with hazardous parts and task processing times uncertainty.
Int. J. Prod. Res., 2018

Design for manufacturing and assembly/disassembly: joint design of products and production systems.
Int. J. Prod. Res., 2018

2017
Decision support for design of reconfigurable rotary machining systems for family part production.
Int. J. Prod. Res., 2017

Integrated process planning and system configuration for mixed-model machining on rotary transfer machine.
Int. J. Comput. Integr. Manuf., 2017

Reducing physical ergonomic risks at assembly lines by line balancing and job rotation: A survey.
Comput. Ind. Eng., 2017

An efficient two-phase iterative heuristic for Collection-Disassembly problem.
Comput. Ind. Eng., 2017

2016
Maximizing the robustness for simple assembly lines with fixed cycle time and limited number of workstations.
Discret. Appl. Math., 2016

2015
Second order conic approximation for disassembly line design with joint probabilistic constraints.
Eur. J. Oper. Res., 2015

An improved Lagrangian relaxation-based heuristic for a joint location-inventory problem.
Comput. Oper. Res., 2015

2014
A sample average approximation method for disassembly line balancing problem under uncertainty.
Comput. Oper. Res., 2014

Integrated Procurement-Disassembly Problem.
Proceedings of the Advances in Production Management Systems. Innovative and Knowledge-Based Production Management in a Global-Local World, 2014

2013
Reconfiguration of Machining Transfer Lines.
Proceedings of the Service Orientation in Holonic and Multi Agent Manufacturing and Robotics, 2013

Robust balancing of straight assembly lines with interval task times.
J. Oper. Res. Soc., 2013

Equipment Location in Machining Transfer Lines with Multi-spindle Heads.
J. Math. Model. Algorithms Oper. Res., 2013

Stability measure for a generalized assembly line balancing problem.
Discret. Appl. Math., 2013

L-Shaped Algorithm for Stochastic Disassembly Line Balancing Problem.
Proceedings of the 7th IFAC Conference on Manufacturing Modelling, Management, and Control, 2013

Parallel Machining of Multiple Parts on Rotary Transfer Machines with Turrets.
Proceedings of the 7th IFAC Conference on Manufacturing Modelling, Management, and Control, 2013

Integrated Decision Making in Flow Line Balancing.
Proceedings of the 7th IFAC Conference on Manufacturing Modelling, Management, and Control, 2013

An Exact Method for the Assembly Line Re-balancing Problem.
Proceedings of the Advances in Production Management Systems. Sustainable Production and Service Supply Chains, 2013

Chance Constrained Programming Model for Stochastic Profit-Oriented Disassembly Line Balancing in the Presence of Hazardous Parts.
Proceedings of the Advances in Production Management Systems. Sustainable Production and Service Supply Chains, 2013

A decomposition method for stochastic partial disassembly line balancing with profit maximization.
Proceedings of the 2013 IEEE International Conference on Automation Science and Engineering, 2013

2012
Reduction approaches for a generalized line balancing problem.
Comput. Oper. Res., 2012

Balancing of simple assembly lines under variations of task processing times.
Ann. Oper. Res., 2012

A Stochastic Formulation of the Disassembly Line Balancing Problem.
Proceedings of the Advances in Production Management Systems. Competitive Manufacturing for Innovative Products and Services, 2012

An Application of Goal Programming Technique for Reconfiguration of Transfer Lines.
Proceedings of the ICINCO 2012 - Proceedings of the 9th International Conference on Informatics in Control, Automation and Robotics, Volume 2, Rome, Italy, 28, 2012


  Loading...