Orhan Engin

According to our database1, Orhan Engin authored at least 14 papers between 2004 and 2018.

Collaborative distances:
  • Dijkstra number2 of five.
  • Erdős number3 of five.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Other 

Links

On csauthors.net:

Bibliography

2018
Hybrid flow shop with multiprocessor task scheduling based on earliness and tardiness penalties.
J. Enterprise Inf. Management, 2018

A new hybrid ant colony optimization algorithm for solving the no-wait flow shop scheduling problems.
Appl. Soft Comput., 2018

2013
Solving Fuzzy Job Shop Scheduling Problems with Availability Constraints Using a Scatter Search Method.
Multiple-Valued Logic and Soft Computing, 2013

2011
An adaptive learning approach for no-wait flowshop scheduling problems to minimize makespan.
Int. J. Comput. Intell. Syst., 2011

An efficient genetic algorithm for hybrid flow shop scheduling with multiprocessor task problems.
Appl. Soft Comput., 2011

2010
Multiprocessor task scheduling in multistage hybrid flow-shops: A parallel greedy algorithm approach.
Appl. Soft Comput., 2010

2009
Parallel Machine Scheduling Problems with Fuzzy Processing Time and Fuzzy Duedate: An Application in an Engine Valve Manufacturing Process.
Multiple-Valued Logic and Soft Computing, 2009

A New Artificial Immune System Algorithm for Multiobjective Fuzzy Flow Shop.
Int. J. Comput. Intell. Syst., 2009

Information systems outsourcing decisions using a group decision-making approach.
Eng. Appl. of AI, 2009

Investigation of Ant System parameter interactions by using design of experiments for job-shop scheduling problems.
Computers & Industrial Engineering, 2009

Laser-based navigation enhanced with 3D time-of-flight data.
Proceedings of the 2009 IEEE International Conference on Robotics and Automation, 2009

2008
An Application Of Effective Genetic Algorithms For Solving Hybrid Flow Shop Scheduling Problems.
Int. J. Comput. Intell. Syst., 2008

A fuzzy approach to define sample size for attributes control chart in multistage processes: An application in engine valve manufacturing process.
Appl. Soft Comput., 2008

2004
A new approach to solve hybrid flow shop scheduling problems by artificial immune system.
Future Generation Comp. Syst., 2004


  Loading...