Shuangyuan Shi

Orcid: 0000-0001-7910-1178

According to our database1, Shuangyuan Shi authored at least 7 papers between 2022 and 2026.

Collaborative distances:
  • Dijkstra number2 of five.
  • Erdős number3 of five.

Timeline

Legend:

Book  In proceedings  Article  PhD thesis  Dataset  Other 

Links

On csauthors.net:

Bibliography

2026
Active Disturbance Rejection Control for Ladle Masonry Robotic Arm Based on Fixed-Time Observer.
Concurr. Comput. Pract. Exp., January, 2026

2024
Comparison study of dispatching rules and heuristics for online scheduling of single machine scheduling problem with predicted release time jobs.
Expert Syst. Appl., 2024

Solving the multi-objective job shop scheduling problems with overtime consideration by an enhanced NSGA-Ⅱ.
Comput. Ind. Eng., 2024

2023
A no-tardiness job shop scheduling problem with overtime consideration and the solution approaches.
Comput. Ind. Eng., 2023

2022
A survey of job shop scheduling problem: The types and models.
Comput. Oper. Res., 2022

A hybrid immune genetic algorithm with tabu search for minimizing the tool switch times in CNC milling batch-processing.
Appl. Intell., 2022

An improved NSGA-Ⅱ for multi-objective job shop scheduling problems with overtime work consideration.
Proceedings of the 5th International Conference on Algorithms, 2022


  Loading...