Miguel A. Salido

Orcid: 0000-0002-4835-4057

According to our database1, Miguel A. Salido authored at least 95 papers between 2000 and 2023.

Collaborative distances:
  • Dijkstra number2 of four.
  • Erdős number3 of four.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

On csauthors.net:

Bibliography

2023
A hybrid metaheuristic with learning for a real supply chain scheduling problem.
Eng. Appl. Artif. Intell., November, 2023

Rooster Colony Algorithm: A two-step Multi-Swarm Optimization Approach.
Proceedings of the Thirty-Sixth International Florida Artificial Intelligence Research Society Conference, 2023

A Q-Learning Proposal for Tuning Genetic Algorithms in Flexible Job Shop Scheduling Problems.
Proceedings of the Thirty-Sixth International Florida Artificial Intelligence Research Society Conference, 2023

2021
IP-cores watermarking scheme at behavioral level using genetic algorithms.
Eng. Appl. Artif. Intell., 2021

2020
Search and rescue optimization algorithm: A new optimization method for solving constrained engineering optimization problems.
Expert Syst. Appl., 2020

A Metaheuristic Search Technique for Solving the Warehouse Stock Management Problem and the Routing Problem in a Real Company.
Proceedings of the Artificial Intelligence XXXVII, 2020

2019
Multi-objective optimization for energy-efficient flexible job shop scheduling problem with transportation constraints.
Robotics Comput. Integr. Manuf., 2019

A Multi-Agent Framework to Solve Energy-Aware Unrelated Parallel Machine Scheduling Problems with Machine-Dependent Energy Consumption and Sequence-Dependent Setup Time.
Proceedings of the Twenty-Ninth International Conference on Automated Planning and Scheduling, 2019

2018
Cooperation Between Smart Manufacturing Scheduling Systems and Energy Providers: A Multi-agent Perspective.
Proceedings of the Service Orientation in Holonic and Multi-Agent Manufacturing, 2018

How to Choose the Greenest Delivery Plan: A Framework to Measure Key Performance Indicators for Sustainable Urban Logistics.
Proceedings of the Advances in Production Management Systems. Smart Manufacturing for Industry 4.0, 2018

Dynamic Rescheduling in Energy-Aware Unrelated Parallel Machine Problems.
Proceedings of the Advances in Production Management Systems. Smart Manufacturing for Industry 4.0, 2018

Chromosome Mutation vs. Gene Mutation in Evolutive Approaches for Solving the Resource-Constrained Project Scheduling Problem (RCPSP).
Proceedings of the Recent Trends and Future Technology in Applied Intelligence, 2018

2017
A Multi-agent Approach to Implement a Reverse Production Virtual Market in Green Supply Chains.
Proceedings of the Advances in Production Management Systems. The Path to Intelligent, Collaborative and Sustainable Manufacturing, 2017

2016
Introduction to the special issue on constraint satisfaction for planning and scheduling.
Knowl. Eng. Rev., 2016

A metaheuristic technique for energy-efficiency in job-shop scheduling.
Knowl. Eng. Rev., 2016

Optimisation System for Cutting Continuous Flat Glass.
ERCIM News, 2016

Energy-efficient dynamic scheduling for a flexible flow shop using an improved particle swarm optimization.
Comput. Ind., 2016

Energy efficiency, robustness, and makespan optimality in job-shop scheduling problems.
Artif. Intell. Eng. Des. Anal. Manuf., 2016

Uncertainty in dynamic constraint satisfaction problems.
AI Commun., 2016

2015
Robustness, stability, recoverability, and reliability in constraint satisfaction problems.
Knowl. Inf. Syst., 2015

Finding robust solutions for constraint satisfaction problems with discrete and ordered domains by coverings.
Artif. Intell. Rev., 2015

Solving the job shop scheduling problem with operators by depth-first heuristic search enhanced with global pruning rules.
AI Commun., 2015

2014
A genetic algorithm for robust berth allocation and quay crane assignment.
Prog. Artif. Intell., 2014

Robustness and Stability in Constraint Programming under Dynamism and Uncertainty.
J. Artif. Intell. Res., 2014

A GRASP-based metaheuristic for the Berth Allocation Problem and the Quay Crane Assignment Problem by managing vessel cargo holds.
Appl. Intell., 2014

PSPLIB-ENERGY: a extension of PSPLIB library to assess the energy optimization in the RCPSP.
Inteligencia Artif., 2014

FSM merging and reduction for IP cores watermarking using Genetic Algorithms.
Proceedings of the 2014 International Conference on ReConFigurable Computing and FPGAs, 2014

Robustness and Stability in Constraint Programming under Dynamism and Uncertainty - (Extended Abstract).
Proceedings of the Principles and Practice of Constraint Programming, 2014

2013
Modeling Robustness in CSPs as Weighted CSPs.
Proceedings of the Integration of AI and OR Techniques in Constraint Programming for Combinatorial Optimization Problems, 2013

2-C6: An fine-grained algorithm to achieve 2-consistency.
Proceedings of the 2013 XXXIX Latin American Computing Conference (CLEI), 2013

2012
A decision support system for managing combinatorial problems in container terminals.
Knowl. Based Syst., 2012

Robustness for a single railway line: Analytical and simulation methods.
Expert Syst. Appl., 2012

Intelligent planning for allocating containers in maritime terminals.
Expert Syst. Appl., 2012

Robust Solutions to Job-Shop Scheduling Problems with Operators.
Proceedings of the IEEE 24th International Conference on Tools with Artificial Intelligence, 2012

An Algorithm for Finding Robust and Stable Solutions for Constraint Satisfaction Problems with Discrete and Ordered Domains.
Proceedings of the IEEE 24th International Conference on Tools with Artificial Intelligence, 2012

A Genetic Algorithm for Berth Allocation and Quay Crane Assignment.
Proceedings of the Advances in Artificial Intelligence - IBERAMIA 2012, 2012

2011
Constraint satisfaction for planning and scheduling problems.
Constraints An Int. J., 2011

A fine-grained arc-consistency algorithm for non-normalized constraint satisfaction problems.
Int. J. Appl. Math. Comput. Sci., 2011

Integrated intelligent techniques for remarshaling and berthing in maritime terminals.
Adv. Eng. Informatics, 2011

Reformulating Dynamic Linear Constraint Satisfaction Problems as Weighted CSPs for Searching Robust Solutions.
Proceedings of the Ninth Symposium on Abstraction, Reformulation, and Approximation, 2011

2010
New trends in constraint satisfaction, planning, and scheduling: a survey.
Knowl. Eng. Rev., 2010

Preface to special issue on planning and scheduling.
Knowl. Eng. Rev., 2010

A holonic architecture for the global road transportation system.
J. Intell. Manuf., 2010

Introduction to planning, scheduling and constraint satisfaction.
J. Intell. Manuf., 2010

Constraint satisfaction techniques in planning and scheduling.
J. Intell. Manuf., 2010

Nogood-FC for solving partitionable constraint satisfaction problems.
J. Intell. Manuf., 2010

Artificial Intelligence Techniques for the Berth Allocation and Container Stacking Problems in Container Terminals.
Proceedings of the Research and Development in Intelligent Systems XXVII, 2010

Domain-Dependent Planning Heuristics for Locating Containers in Maritime Terminals.
Proceedings of the Trends in Applied Intelligent Systems, 2010

Robust Solutions in Changing Constraint Satisfaction Problems.
Proceedings of the Trends in Applied Intelligent Systems, 2010

AC2001-OP: An Arc-Consistency Algorithm for Constraint Satisfaction Problems.
Proceedings of the Trends in Applied Intelligent Systems, 2010

2009
Meta-heuristic and Constraint-Based Approaches for Single-Line Railway Timetabling.
Proceedings of the Robust and Online Large-Scale Optimization: Models and Techniques for Transportation Systems, 2009

Experimental analysis of optimization techniques on the road passenger transportation problem.
Eng. Appl. Artif. Intell., 2009

Extending arc-consistency algorithms for Non-Normalized CSPs.
Proceedings of the Research and Development in Intelligent Systems XXVI, 2009

2-C3: From Arc-Consistency to 2-Consistency.
Proceedings of the Eighth Symposium on Abstraction, Reformulation, and Approximation, 2009

A Planning Tool for Minimizing Reshuffles in Container Terminals.
Proceedings of the ICTAI 2009, 2009

2-C3OP: An Improved Version of 2-Consistency.
Proceedings of the ICTAI 2009, 2009

An Artificial Intelligence Planning Tool for the Container Stacking Problem.
Proceedings of 12th IEEE International Conference on Emerging Technologies and Factory Automation, 2009

Stability of Solutions in Constraint Satisfaction Problems.
Proceedings of the Artificial Intelligence Research and Development, 2009

AC3-OP: An Arc-Consistency Algorithm for Arithmetic Constraints.
Proceedings of the Artificial Intelligence Research and Development, 2009

2008
A Genetic Algorithm for Railway Scheduling Problems.
Proceedings of the Metaheuristics for Scheduling in Industrial and Manufacturing Applications, 2008

Introduction: Special issue on constraint satisfaction techniques for planning and scheduling problems.
Eng. Appl. Artif. Intell., 2008

Feasible distributed CSP models for scheduling problems.
Eng. Appl. Artif. Intell., 2008

Distributed search in railway scheduling problems.
Eng. Appl. Artif. Intell., 2008

A non-binary constraint ordering heuristic for constraint satisfaction problems.
Appl. Math. Comput., 2008

2007
Domain-dependent distributed models for railway scheduling.
Knowl. Based Syst., 2007

Aplicación de Metodologías Activas en la Enseñanza de Informática en la Licenciatura en Matemáticas.
Rev. Iberoam. de Tecnol. del Aprendiz., 2007

Distributed CSPs: Why It Is Assumed a Variable per Agent?
Proceedings of the Abstraction, 2007

DFS-Tree Based Heuristic Search.
Proceedings of the Abstraction, 2007

2006
Distributed CSPs by graph partitioning.
Appl. Math. Comput., 2006

New Heuristics to Solve the "CSOP" Railway Timetabling Problem.
Proceedings of the Advances in Applied Artificial Intelligence, 2006

2005
Optimization in railway scheduling.
Proceedings of the ICINCO 2005, 2005

Distributed Constraints for Large-Scale Scheduling Problems.
Proceedings of the Principles and Practice of Constraint Programming, 2005

A Heuristic Technique for the Capacity Assessment of Periodic Trains.
Proceedings of the Artificial Intelligence Research and Development, 2005

A Scheduling Order-Based Method to Solve Timetabling Problems.
Proceedings of the Current Topics in Artificial Intelligence, 2005

2004
A Topological Model Based on Railway Capacity to Manage Periodic Train Scheduling.
Proceedings of the Applications and Innovations in Intelligent Systems XII, 2004

A Non-Binary Constraint Ordering Approach to Scheduling Problems.
Proceedings of the Applications and Innovations in Intelligent Systems XII, 2004

A Decision Support System (DSS) for the Railway Scheduling Problem.
Proceedings of the Artificial Intelligence Applications and Innovations, 2004

Constrainedness and Redundancy by Constraint Ordering.
Proceedings of the Advances in Artificial Intelligence, 2004

An Efficient Method to Schedule New Trains on a Heavily Loaded Railway Network.
Proceedings of the Advances in Artificial Intelligence, 2004

Intelligent Train Scheduling on a High-Loaded Railway Network.
Proceedings of the Algorithmic Methods for Railway Optimization, 2004

Exploiting the Constrainedness in Constraint Satisfaction Problems.
Proceedings of the Artificial Intelligence: Methodology, 2004

2003
A polynomial algorithm for continuous non-binary disjunctive CSPs: extended DLRs.
Knowl. Based Syst., 2003

Técnicas para el manejo de CSPs no binarios.
Inteligencia Artif., 2003

Introducción a la programación de restricciones.
Inteligencia Artif., 2003

How to Classify Hard and Soft Constraints in Non-binary Constraint Satisfaction Problems.
Proceedings of the Research and Development in Intelligent Systems XX, 2003

Volume under the ROC Surface for Multi-class Problems.
Proceedings of the Machine Learning: ECML 2003, 2003

Distributed Non-binary Constraints.
Proceedings of the Current Topics in Artificial Intelligence, 2003

An Interactive Train Scheduling Tool for Solving and Plotting Running Maps.
Proceedings of the Current Topics in Artificial Intelligence, 2003

2002
Problemas de Satisfaccion de Restricciones no Binarias con Dominios Continuos.
Inteligencia Artif., 2002

Disjunctive and Continuous Constraint Satisfaction Problems.
Proceedings of the Principles and Practice of Constraint Programming, 2002

Disjunction of Non-binary and Numeric Constraint Satisfaction Problems.
Proceedings of the Topics in Artificial Intelligence, 5th Catalonian Conference on AI, 2002

2001
Realizing a Global Hyperpolyhedron Constraint via LP Techniques.
Proceedings of the KI-2001 Workshop AI in Planning, 2001

An Incremental and Non-binary CSP Solver: The Hyperpolyhedron Search Algorithm.
Proceedings of the Principles and Practice of Constraint Programming, 2001

2000
Heuristic Methods for Solving Job-Shop Scheduling Problems.
Proceedings of the 14th Workshop "New Results in Planning, 2000

Scheduling in a Planning Environment.
Proceedings of the 14th Workshop "New Results in Planning, 2000


  Loading...