Claude Le Pape

According to our database1, Claude Le Pape authored at least 35 papers between 1987 and 2016.

Collaborative distances:
  • Dijkstra number2 of four.
  • Erdős number3 of four.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Other 

Links

On csauthors.net:

Bibliography

2016
Production scheduling with a piecewise-linear energy cost function.
Proceedings of the 2016 IEEE Symposium Series on Computational Intelligence, 2016

Certification Under Uncertainties of Control Methods for Multisource Elevators.
Proceedings of the Intelligent Systems Design and Applications, 2016

A Method for the Energy Optimization of a Multisource Elevator.
Proceedings of the Informatics in Control, Automation and Robotics, 2016

The Sourcing Problem - Energy Optimization of a Multisource Elevator.
Proceedings of the 13th International Conference on Informatics in Control, Automation and Robotics (ICINCO 2016), 2016

2015
Multisource elevator energy optimization and control.
Proceedings of the European Control Conference, 2015

2006
Constraint-Based Scheduling and Planning.
Proceedings of the Handbook of Constraint Programming, 2006

2005
Exploring relaxation induced neighborhoods to improve MIP solutions.
Math. Program., 2005

Scheduling a single machine to minimize a regular objective function under setup constraints.
Discrete Optimization, 2005

Integration of Rules and Optimization in Plant PowerOps.
Proceedings of the Integration of AI and OR Techniques in Constraint Programming for Combinatorial Optimization Problems, 2005

2004
Solving a Network Design Problem.
Annals OR, 2004

2002
Abstracts of Invited Talks.
Electr. Notes Theor. Comput. Sci., 2002

Robust and Parallel Solving of a Network Design Problem.
Proceedings of the Principles and Practice of Constraint Programming, 2002

2001
Combining local and global search in a constraint programming environment.
Knowledge Eng. Review, 2001

2000
Predictive Personnel Management.
IEEE Intelligent Systems, 2000

Introduction.
Constraints, 2000

Constraint Propagation and Decomposition Techniques for Highly Disjunctive and Highly Cumulative Project Scheduling Problems.
Constraints, 2000

1999
Heuristic Control of a Constraint-Based Algorithm for the Preemptive Job-Shop Scheduling Problem.
J. Heuristics, 1999

Satisfiability tests and time‐bound adjustmentsfor cumulative scheduling problems.
Annals OR, 1999

1998
Constraint propagation for ordering, abstraction, and aggregation relations.
J. Exp. Theor. Artif. Intell., 1998

Constraint-Based Job Shop Scheduling with \sc Ilog Scheduler.
J. Heuristics, 1998

Introduction to a Benchmark Column in CONSTRAINTS.
Constraints, 1998

Resource Constraints for Preemptive Job-shop Scheduling.
Constraints, 1998

Global Constraints for Partial CSPs: A Case-Study of Resource and Due Date Constraints.
Proceedings of the Principles and Practice of Constraint Programming, 1998

1996
Constraint Propagation Techniques for Disjunctive Scheduling: The Preemptive Case.
Proceedings of the 12th European Conference on Artificial Intelligence, 1996

1995
A Theoretical and Experimental Comparison of Constraint Propagation Techniques for Disjunctive Scheduling.
Proceedings of the Fourteenth International Joint Conference on Artificial Intelligence, 1995

1994
PMFP: The Use of Constraint-Based Programming for Predictive Personnel Management.
Proceedings of the Eleventh European Conference on Artificial Intelligence, 1994

1992
Using Constraint Propagation in Blackboard Systems: A Flexible Software Architecture for Reactive and Distributed Systems.
IEEE Computer, 1992

1991
Adapting the behavior of a job-shop scheduling system.
Decision Support Systems, 1991

Issues in the Design of AI-Based Schedulers - Workshop Report.
AI Magazine, 1991

Simulating actions and perception of autonomous mobile robots in a multi-agent indoor environment.
Proceedings of the IEEE/RSJ International Conference on Intelligent Robots and Systems, 1991

1990
Indoor automation with many mobile robots.
Proceedings of the IEEE International Workshop on Intelligent Robots and Systems '90, 1990

A combination of centralized and distributed methods for multi-agent planning and scheduling.
Proceedings of the 1990 IEEE International Conference on Robotics and Automation, 1990

1988
SONIA: A knowledge-based scheduling system.
AI in Engineering, 1988

1987
Management of Temporal Constraints for Factory Scheduling.
Proceedings of the Temporal Aspects in Information Systems, 1987

Controlling Constraint Propagation.
Proceedings of the 10th International Joint Conference on Artificial Intelligence. Milan, 1987


  Loading...