Angelo Oddi

According to our database1, Angelo Oddi authored at least 64 papers between 1993 and 2018.

Collaborative distances:
  • Dijkstra number2 of five.
  • Erdős number3 of four.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Other 

Links

On csauthors.net:

Bibliography

2018
Greedy Randomized Search for Scalable Compilation of Quantum Circuits.
Proceedings of the Integration of Constraint Programming, Artificial Intelligence, and Operations Research, 2018

Energy-Aware Multiple State Machine Scheduling for Multiobjective Optimization.
Proceedings of the AI*IA 2018 - Advances in Artificial Intelligence, 2018

2017
Multi-Objective Optimization in a Job Shop with Energy Costs through Hybrid Evolutionary Techniques.
Proceedings of the Twenty-Seventh International Conference on Automated Planning and Scheduling, 2017

2016
Leveraging constraint-based approaches for multi-objective flexible flow-shop scheduling with energy costs.
Intelligenza Artificiale, 2016

2015
Scatter search with path relinking for the job shop with time lags and setup times.
Computers & OR, 2015

Experimental evaluation of algorithms for solving problems with combinatorial explosion.
AI Commun., 2015

A Multi-objective Large Neighborhood Search Methodology for Scheduling Problems with Energy Costs.
Proceedings of the 27th IEEE International Conference on Tools with Artificial Intelligence, 2015

Surveying the Versatility of Constraint-Based Large Neighborhood Search for Scheduling Problems.
Proceedings of the Beyond Databases, Architectures and Structures, 2015

Efficient Power-Aware Resource Constrained Scheduling and Execution for Planetary Rovers.
Proceedings of the AI*IA 2015, Advances in Artificial Intelligence, 2015

2013
Efficient Energy Management for Autonomous Control in Rover Missions.
IEEE Comp. Int. Mag., 2013

2012
Iterative Improvement Algorithms for the Blocking Job Shop.
Proceedings of the Twenty-Second International Conference on Automated Planning and Scheduling, 2012

2011
Deploying Interactive Mission Planning Tools - Experiences and Lessons Learned.
JACIII, 2011

MrSPOCK - Steps in developing an end-to-end space application.
Computational Intelligence, 2011

Solving job shop scheduling with setup times through constraint-based iterative sampling: an experimental analysis.
Ann. Math. Artif. Intell., 2011

Constraint-based methods for scheduling discretionary services.
AI Commun., 2011

Iterative Flattening Search for the Flexible Job Shop Scheduling Problem.
Proceedings of the IJCAI 2011, 2011

Scheduling a Single Robot in a Job-Shop Environment through Precedence Constraint Posting.
Proceedings of the Modern Approaches in Applied Intelligence, 2011

2010
Iterative flattening search for resource constrained scheduling.
J. Intelligent Manufacturing, 2010

Project Scheduling as a Disjunctive Temporal Problem.
Proceedings of the ECAI 2010, 2010

Job Shop Scheduling with Setup Times: Exploring the Applicability of a Constraint-based Iterative Sampling Approach.
Proceedings of the 17th RCRA workshop on Experimental Evaluation of Algorithms for Solving Problems with Combinatorial Explosion, 2010

2009
Solve-and-robustify.
J. Scheduling, 2009

Developing an End-to-End Planning Application from a Timeline Representation Framework.
Proceedings of the Twenty-First Conference on Innovative Applications of Artificial Intelligence, 2009

Solving Resource-Constrained Project Scheduling Problems with Time-Windows Using Iterative Improvement Algorithms.
Proceedings of the 19th International Conference on Automated Planning and Scheduling, 2009

2008
Combining variants of iterative flattening search.
Eng. Appl. of AI, 2008

Continuous Plan Management Support for Space Missions: the RAXEM Case.
Proceedings of the ECAI 2008, 2008

Iterative Flattening Search on RCPSP/max Problems: Recent Developments.
Proceedings of the Recent Advances in Constraints, 2008

Hybrid Variants for Iterative Flattening Search.
Proceedings of the Integration of AI and OR Techniques in Constraint Programming for Combinatorial Optimization Problems, 2008

2007
Improving Robustness of Spacecraft Downlink Schedules.
IEEE Trans. Systems, Man, and Cybernetics, Part C, 2007

Mexar2: AI Solves Mission Planner Problems.
IEEE Intelligent Systems, 2007

Integrating planning and scheduling in workflow domains.
Expert Syst. Appl., 2007

From precedence constraint posting to partial order schedules: A CSP approach to Robust Scheduling.
AI Commun., 2007

An Innovative Product for Space Mission Planning: An A Posteriori Evaluation.
Proceedings of the Seventeenth International Conference on Automated Planning and Scheduling, 2007

Boosting the Performance of Iterative Flattening Search.
Proceedings of the AI*IA 2007: Artificial Intelligence and Human-Oriented Computing, 2007

2006
IPSS: A Hybrid Approach to Planning and Scheduling Integration.
IEEE Trans. Knowl. Data Eng., 2006

From Demo to Practice the Mexar Path to Space Operations.
Proceedings of the Advances in Applied Artificial Intelligence, 2006

Software Companion: The Mexar2 Support to Space Mission Planners.
Proceedings of the ECAI 2006, 17th European Conference on Artificial Intelligence, August 29, 2006

2005
Schedule Robustness Through Broader Solve and Robustify Search for Partial Order Schedules.
Proceedings of the AI*IA 2005: Advances in Artificial Intelligence, 2005

Exploiting Temporal Flexibility to Obtain High Quality Schedules.
Proceedings of the Proceedings, 2005

2004
User Interaction with an Automated Solver: The Case of a Mission Planner.
PsychNology Journal, 2004

RoboCare: Pervasive Intelligence for the Domestic Care of the Elderly.
Intelligenza Artificiale, 2004

IPSS: A Hybrid Reasoner for Planning and Scheduling.
Proceedings of the 16th Eureopean Conference on Artificial Intelligence, 2004

Generating Robust Partial Order Schedules.
Proceedings of the Principles and Practice of Constraint Programming, 2004

Generating Robust Schedules through Temporal Flexibility.
Proceedings of the Fourteenth International Conference on Automated Planning and Scheduling (ICAPS 2004), 2004

2003
Generating High Quality Schedules for a Spacecraft Memory Downlink Problem.
Proceedings of the Principles and Practice of Constraint Programming, 2003

A CSP-Based Interactive Decision Aid for Space Mission Planning.
Proceedings of the AI*IA 2003: Advances in Artificial Intelligence, 2003

2002
A Constraint-Based Method for Project Scheduling with Time Windows.
J. Heuristics, 2002

2001
A Constraint-Based Architecture for Flexible Support to Activity Scheduling.
Proceedings of the AI*IA 2001: Advances in Artificial Intelligence, 2001

2000
Toward interactive scheduling systems for managing medical resources.
Artificial Intelligence in Medicine, 2000

Incremental Forward Checking for the Disjunctive Temporal Problem.
Proceedings of the ECAI 2000, 2000

Iterative Flattening: A Scalable Method for Solving Multi-Capacity Scheduling Problems.
Proceedings of the Seventeenth National Conference on Artificial Intelligence and Twelfth Conference on on Innovative Applications of Artificial Intelligence, July 30, 2000

1999
An Iterative Sampling Procedure for Resource Constrained Project Scheduling with Time Windows.
Proceedings of the Sixteenth International Joint Conference on Artificial Intelligence, 1999

Greedy Algorithms for the Multi-capacitated Metric Scheduling Problem.
Proceedings of the Recent Advances in AI Planning, 5th European Conference on Planning, 1999

TimeNetManager - A Software Tool for Generating Random Temporal Networks.
Proceedings of the AI*IA 99:Advances in Artificial Intelligence, 1999

1998
Solving Multiple Capacitated Scheduling Problems with Tabu Search.
ECAI, 1998

Scheduling Multi-capacitated Resources Under Complex Temporal Constraints.
Proceedings of the Principles and Practice of Constraint Programming, 1998

Profile-Based Algorithms to Solve Multiple Capacitated Metric Scheduling Problems.
Proceedings of the Fourth International Conference on Artificial Intelligence Planning Systems, 1998

1997
A Tabu Search Strategy to Solve Scheduling Problems with Deadlines and Complex Metric Constraints.
Proceedings of the Recent Advances in AI Planning, 4th European Conference on Planning, 1997

A Weakly Backjumping Strategy to Solve Hard Scheduling Problems.
Proceedings of the AI*IA 97: Advances in Artificial Intelligence, 1997

Stochastic Procedures for Generating Feasible Schedules.
Proceedings of the Fourteenth National Conference on Artificial Intelligence and Ninth Innovative Applications of Artificial Intelligence Conference, 1997

1996
Gaining Efficiency and Flexibility in the Simple Temporal Problem.
Proceedings of the Third International Workshop on Temporal Representation and Reasoning, 1996

1995
A Formal Domain Description Language for a Temporal Planner.
Proceedings of the Topics in Artificial Intelligence, 1995

1994
Managing Dynamic Temporal Constraint Networks.
Proceedings of the Second International Conference on Artificial Intelligence Planning Systems, 1994

1993
Maintaining Consistency in a Quantitative Time Manager.
Proceedings of the Fifth International Conference on Tools with Artificial Intelligence, 1993

Maintaining Consistency in Quantitative Temporal Constraint Networks for Planning and Scheduling.
Proceedings of the Advances in Artificial Intelligence, 1993


  Loading...